Before you start
- Choose the right company. You need access to Projects and tasks and the right to add or edit.
- If you work on assigned data, the project and the task must be within your access scope.
Check the share of completed tasks
The "Completed tasks" indicator divides the number of tasks with a completed status by all tasks within your access scope. The caption shows both numbers. It covers all the tasks you can access, whatever the week and whatever the filters of a single board.
Zero completed tasks means 0%. When there are no tasks, you will see "No tasks". A read error is not a zero result. The indicator describes saved task statuses. It does not rate an employee or their pace of work.
Plan a sprint in an existing project
If a project is missing, create it in Projects or ask the administrator for access. A sprint does not create a new project and needs the right to create.
The backlog first shows up to 12 loaded tasks. "Show more tasks" reveals the next ones, and the caption shows how many tasks are visible. Expanding the list does not assign anything. After you change the sprint, the projects or the access scope, the list starts again from the first part.
- Open Projects and tasks → Plans → Sprints → New sprint. Choose the project the planned work belongs to.
- Enter a name, an optional goal and the dates. The end must fall after the start. Duration is given in calendar days, also when the clocks change.
- Choose "Create sprint" and check the result. If there is an error or access is denied, the form keeps what you entered.
- Under tasks to plan you will find open tasks without a sprint. Assign to a sprint only tasks from the same project.
Prepare a project from an offer
The source stays in the project's description and labels. A later change to the offer does not update the project automatically. Creating a project does not close the sale and does not give the client access.
If loading fails, use "Retry loading the offer" or go back to it in CRM. After you change the company, the person or the permissions, the previous form is removed. Prepare the project in the right context.
- Open the specific offer in CRM and choose "Plan delivery" or "Create job order".
- In the "Project based on offer" form, check the name, the scope and the link to the source offer. You need access to the offer and the right to create projects.
- Correct the name or description, then choose "Create project". Just opening the form saves nothing. A save error keeps your corrections, so check the result before you try again.
- After saving, "Source offer" in the list and in the project details opens that specific offer, if you have access to it.
Work on one matter in a project
- In Projects and tasks, choose the "Projects" view. Search by name or description, or narrow by status. Open a project by choosing its name.
- In the project details you will first see "Tasks". Choose a title to open its details, or "Add task" to create another task in this project. You can group the list. The button next to a group name expands and collapses its contents.
- In "Materials" you will see all linked documents and sheets. Choose a material's name to open that specific document or sheet. On a computer, a short preview of the materials is also next to the tasks, and on a smaller screen below them.
- In "Team and staffing", set the people and the project staffing. Ready-made sets are under "Add from a ready set". "Conversation" has its own participants. Adding a person to the project team does not automatically give them access to a private conversation.
A material being ready and being shared are two different things (note) A draft is not ready to hand to a client. The "Ready to hand over" counter takes into account the published version and the material's settings, but it does not confirm that a public link exists or that the client has access. Check these separately in the document or sheet.
Open an entry created from Inbox
After you approve an e-mail proposal in Inbox, choose "Open task in Workspace" or "Open project in Workspace". The first link opens the details of that specific task, the second its project. Following the link does not save changes and does not create a second entry.
You can open or refresh the link again. The recipient must have current access to the company and to the given record. If there is an error, use the retry option. If the entry is unavailable, check the company and the permissions. The screen does not open a different task or project in its place.
Closing the task link keeps the current view and the list filters. Changing the user, the company or the access scope removes the previous selection and any unsaved form.
See also:
Add a task with a concrete result
- Open Projects and tasks. On the start screen, choose "New task".
- Enter a title that says what needs to be done, for example "Prepare the station before the visit". In the description, add how the person doing it will recognise the finished result.
- Choose a project if the task belongs to a specific matter. In the "Assign to" field, pick a person, and in "Due date" choose a date.
- Set the status, priority and category. Tags are optional. In the "Checklist" tab you can break the work into shorter actions.
- Choose "Create task". Check the message and find the task in the right project or task view.
The title names the action, and the project, person and due date help settle who is responsible.
Assigning a task does not give access to the project
The person picked in "Assign to" is responsible for doing the task. Access also depends on module permissions, the data scope and the project team.
If an employee cannot see the task, the owner should check their permissions and their membership in the project. Do not share the owner's account and do not widen a role without need.
See also:
Prepare a training agenda draft
- Open the project details and choose "Prepare agenda". Enter the topic, and optionally the audience, the duration (15 to 480 minutes), the format and the planned date. The draft is built from the fields you enter, not from saved project data.
- Before preparing, check the estimated cost shown in the window: 6 to 20 Asystio Coins.
- Read and correct the preview of the title, description, agenda points, preparation, materials and tasks after the meeting. You can change the input and prepare the draft again.
- Choose "Copy text" and paste the checked content into the meeting document. Save the document separately, using its own save.
This is only a proposal to check (note) The dialog does not save the agenda in the project, does not create tasks or files and sends nothing. Before you use it, check the content and the arrangements.
Update the status and details
- Open a saved task. In "Details", correct the description, assignment, due date or status.
- In "Checklist", tick the actions that are done, matching real progress. Finishing a single item does not have to mean the whole task is finished.
- Choose "Save changes" and check the current entry. If you are looking for the task in another view, check the active filters for project, person and status.
Add a note for the team or a comment for the client
- In a saved task, open "Notes" and type the text.
- For internal arrangements, leave "Share with client" off and choose "Add note".
- If the comment should be visible to the client, check the project and its link to the client. Only then turn on "Share with client" and read the text once more.
- Choose "Send to client". Check the result message. The comment is a team message in the client portal, not confirmation that an e-mail or SMS was sent.
Do not share internal arrangements by mistake (warning) Before you use "Send to client", check the recipient and the text. Do not put in it other clients' data, pay, or private remarks about the team.
Link a task to working time
Assignment and due date help you plan the work, but they are not a record of hours worked. If you log your own time on a project, use the proper working time feature and check the entry separately.
See also:
If you cannot see the task or saving failed
When something does not work
- The project list is empty after a search: Check the phrase and the status, or choose "Clear filters". A filter does not delete a project.
- The link to a material does not open the document: Check the company and the project. The screen will not open a substitute document when the chosen material is unavailable. Pick the right material from the list. If you are working in the project area, "Show all documents" takes you back to the whole available list.
- Switching documents asks about unsaved changes: Cancel the move and save the draft if you want to keep your edit. "Discard changes and continue" removes unsaved changes from the current editor. Wait for the save confirmation before you close the page.
- A project or person is not on the list: Check the company, the permissions and the membership in the project. Lack of access is not a reason to create a second project with the same name.
- The task disappeared after a status change: Check the status filter and the project. The task may not fit the current view. Clear the filter first, before you decide it was deleted.
- A connection error appeared after creating: Refresh the list and search for the title in the chosen project. Do not create the task a second time if the first save may have gone through.
- The client does not see the comment: Check the project's link to the client, the way the note was added and the result message. An internal note does not automatically become a message for the client.