Skip to content
MirrorTry a hairstyle, makeup, nails or a tattoo, or a free skin care preview.Try it without an account

Connect recipes, production and product sales

Check usage, settle production and losses, then prepare an offer and shipping.

Inventory and safety

Before you start

  • The right company and access to the right part of Inventory. Publishing offers, changing stock, production and approving losses each have their own permissions.
  • Checked product units, stock levels, locations and batches. A recipe needs an existing service; production needs a finished product, materials and a BOM.

Record the materials used during a service

A recipe plans the materials you need. Saving it does not confirm that the materials were actually used. Do not confuse the pack unit with the amount of material used on a service.

  1. Open Inventory → Recipes and add or edit a recipe. Choose an existing service.
  2. In "Ingredients" use "Add", choose a product and enter the amount used in the unit shown. Add a note if the amount depends on, for example, the variant of the service.
  3. Check the total cost of the ingredients and choose "Save recipe". Open the saved recipe again and compare the ingredients with how the service is really done.

Compare demand and service cost

A margin worked out from the service price and the materials is not the company's profit. It may leave out labour, rent, taxes or other costs. An availability signal does not replace checking batches and expiry dates.

  1. In "Usage" compare the planned needs with the available result. In "Shortages for visits" check the product, the service and the reason given for the shortage.
  2. In "Service cost" check the cost of materials and the price of the service. A missing recipe or price limits the calculation.
  3. If you use the recipe suggestions or the "Price advisor", review the proposal and check the amounts, quality and costs yourself before you change any data.

Prepare a BOM, the bill of materials for a product

A product BOM and a service recipe describe different processes. Saving a BOM does not use up materials and does not create a finished batch.

  1. Open Production → BOM → New BOM. Choose the finished product, a name, the batch size and the unit.
  2. Add the materials, amounts, units and the way they are issued. Fill in the planned waste and notes to match the real process.
  3. Choose "Save draft". Check the saved BOM and the approval action available for it before you use it in a new order.

Run a production order

The planned amount and a "started" status do not confirm that the product was received. Issuing materials and receiving a batch change stock. If the result is unknown, check the order and the movements before you try again.

  1. In Production → Orders create an order based on a BOM. Choose the production place, the planned amount and the dates, then check the materials.
  2. In the draft details use "Refresh materials". After you check availability, choose "Schedule", and when the work really begins, "Start".
  3. During the work, record the actual amounts with "Save usage". If you track batches, choose the right available batch at the production place.
  4. After the materials are settled, in "Receive finished batch" enter the good and rejected amounts, the batch number and the real dates. Check the result of the receipt for inspection.

Record an inspection, release a batch and create a passport

Saving an inspection or a passport documents the data in the portal. It is not an external product certificate and does not alone confirm that all requirements are met.

  1. In "Quality" or in the order details, choose the type of inspection and enter the real result. For a measurement, enter the value, the unit and the limits.
  2. Choose "Save inspection" and check the assessment. "Release batch" is available once the required inspections are met. A non-conformity needs an explanation.
  3. If you reject a batch, read the consequences and confirm the right operation. Rejecting a whole batch writes the quarantined stock off as a loss, and it cannot be undone.
  4. For finished production, in the "Product passport" enter the serial number and any end of life. Use "Create passport" and check the link and the public preview before you share it.

Check the composition and the sources of the chemical assessment

  1. Open Production → Chemical compliance. Check the products that need their composition completed and the saved assessments.
  2. For each assessment, compare the product, the composition read, the date and the sources given. If the label reading is missing or incomplete, complete it after you check the packaging.
  3. Do the human review shown, or open the related case. A change in a source publication is not an automatic confirmation of a ban on, or the safety of, a specific product.

See also:

Record a loss and approve the stock write-off

You do not need the pattern analysis to record a loss. In "Signals" choose "Run pattern analysis" when you want to check irregularities separately, or "Prepare recommendations" to get proposed actions. In "30-day risk" the forecast is started with "Run forecast". Just opening these tabs does not start an AI analysis. No analysis run does not mean no risk.

If reading the location fails, use "Try again". Do not record the loss at a random site.

  1. In "Losses and recovery" choose "Record loss". Point to the location, the product, the batch if any, the amount and the true cause.
  2. Check the entry that is waiting for a decision. "Approve and deduct" is a separate operation from recording, and "Reject entry" has a different effect.
  3. After the decision, check the loss history and the product stock. Do not add a second correction for the same approved loss.
  4. In the available insights, forecasts and reduction targets, compare the scope and the dates. A reduction target describes a plan, not material that was actually recovered.

Prepare a product sales offer

In "Margin" compare the cost and the price. A sale price and a published offer do not confirm an order, a payment or the handing over of the product.

  1. In "For sale" choose products from the inventory. Check the name, price, availability, photos and sales channel.
  2. Create draft offers. In "Offers" review the content and the terms, then choose "Approve" and the right publication, on purpose.
  3. After publishing, check the result of each item and the target channel. A bulk operation may succeed only in part.

Check the order, shipping and invoice

Generating a label does not confirm that the parcel was sent. Preparing an invoice does not confirm that it was paid, fiscalised or sent to KSeF (the Polish national e-invoice system). Each of these stages has its own result.

  1. In "Client orders" open the right order and check the items, the recipient, the payment status and the delivery.
  2. In "Packing and shipping" check the label and the parcel data before you confirm shipping. Compare the result with the state of the order and of the inventory.
  3. In "Invoices" choose to prepare an invoice from the right products, and check the buyer and VAT. After saving, open the document in Finance.

Check connections, mapping and synchronisation

  1. In "Sales channels" check the state of the Allegro and InPost connections. The connection shown should match the right company account.
  2. In "Offer mapping" compare the channel offer with the product in the catalogue. A match by name needs a check of the code and the unit.
  3. Before "Synchronise stock" check the scope and the availability. After the attempt, read the "Synchronisation history" and any errors on single items.
  4. In orders from the channels, check fulfilment and shipping. The result of a stock synchronisation does not confirm that an order was sent.

Improve a photo after you check the new version

  1. Open "Product photos", choose a product and add its photo. Check the type, the size and your rights to the material.
  2. Run the available enhancement after you check its scope and cost. Compare the original with the working version, especially the packaging, the label, the colour and the contents of the product.
  3. Only "Save to product" approves the use of the chosen version. Check it on the product card. Generating a proposal does not overwrite the original.

When stock, an inspection or a publication needs clarifying

When something does not work

  • After you recorded a loss, the form came back or there is no confirmation: Do not record it a second time straight away. Refresh the register in Losses and recovery and check the product, location, batch, amount and the time of the attempt. If the entry is already waiting for a decision, carry on with it. Recording alone does not reduce stock. Only the separate approval changes it.
  • Invalid recipe ingredient settings: Check the unit and the usage settings. As the message says, remove the wrong ingredient and add it again after you verify it. Do not save an arbitrary amount to get around the block.
  • You cannot use a material or release a batch: Check the place, the available amount, reservations, the batch status and the required inspections. Do not change expiry dates or quality ratings without a real basis.
  • A publication or synchronisation partly succeeded: Read the result of each item and its state in the channel. Fix the errors shown. Do not publish the whole list again without checking the items already done.
  • Unknown result of a stock change or shipment: Check the movements, the order, the client order and the parcel. Keep the time of the attempt and the message. Try again only after you know what the service saved or accepted.

See also